|
| Drilling
and workover rigs equipment: mechanically and
hydraulically driven rotary tables,
power swivels, roller chain
transmissions, roller chains, wire
lines, steam generators, mobile
lighting systems, diesel and oil
tanks, metallic constructions, aso. |
 |
 |
BOP
SYSTEMS : 2000 – 15000 PSI WP, 7 1/16”
- 20 3/4" opening
diameter, horizontal and annular
B.O.Ps, hydraulically or
mechanically operated, 2000
& 3000 PSI B.O.Ps hydraulic
control units,
B.O.Ps manifolds, production
preventors
|
| Cementing
equipments:
5000
– 15000 PSI WP skid and truck
mounted cementing and fracturing
units, truck mounted containers for
bulk cement transportation, skid
mounted silos for storing
and transfer of pulverulent
materials, cementing heads,
cementing devices, shoes, niples,
aso |
 |
 |
Well
head equipment:
Well
heads, X-mass trees, chokes, gate
& ball valves, pneumatic or
hidraulic actuators for valves
drive.
|
|
Drilling, cementing, fishing and
workover jobs tools:
Manual
tongs, elevators, spiders,
spider-elevators, slips, safety
clamps, kelly cocks, rock bits,
stabilizers, cementing heads,
cementing devices, shoes and
collars,
fishing & workover tools.
|
 |
|